Little Bit at a Time
I’ve tried to stop by my house every day after work this week and just install one row of flooring. (It’s been in the 90s, so I really can’t work that long anyway.) I figure I’ll slowly make progress this week. Here’s how things are looking after today.
So it looks like I have about six more rows to install. Then, I’ll either have to cut the maple boards to make them fit or cut away more of the old flooring. I’ll probably end up doing the latter, but I’ll see how it goes when I get to that last row.